Aspen Middle School

Project Location: Aspen, Colorado

Project Description:

Hall-Irwin was hired to renovate Aspen Middle School's field converting it from natural sod to synthetic turf. We also added stadum lighting and site concrete. For this project our team removed the existing field and re-graded it to resolve drainage issues. Then to prepare for the synthetic turf, we laser graded the field area and installed an underdrain system. Finally, we installed the synthetic turf system.