Colorado School of Mines: Brook’ s Field

Project Location: Golden, Colorado

Project Description:

Hall-Irwin was the general contractor for Brook’s Field Turf Replacement project. This was our second athletic project completed for Colorado School of Mines. This included over lot grading required to remove the existing natural grass field and associated systems that were existing at Brook’s Stadium and construct a new synthetic turf playing surface to NCAA specifications. The project also encompassed earthwork, curbs, sidewalks, and plazas, recycled asphalt parking, fencing, utilities, and field lighting.