Colorado State University Multi-Purpose Athletic Complex

Project Location: Pueblo, Colorado

Project Description:

The scope for the 160,000 square foot athletic complex project at CSU Pueblo included construction of a multiuse intramural field. For this project, Hall-Irwin coordinated the earthwork (and laser grading the site), under drain system, site concrete (flatwork, colored, and structural), an aggregate field base, site lighting, testing, surveying, certified track, landscape, irrigation, installed a synthetic turf field, and constructed a storage building.