Evergreen High School Football Field Renovation

Project Location: Evergreen, Colorado

Project Description:

Hall-Irwin converted a natural sod football field into a synthetic turf field with a certified track around it. To do this we started by removing the existing field, excavating to resolve drainage issues, and laser grading to fine-tune the contours of the site. We also installed an underdrain system, installed site utilities, sports field equipment, site concrete , an aggregate field base, and stadium lighting. Then we installed the synthetic turf system a certified track around the field.