Husky Stadium

Project Location: Air Force Academy, Colorado Springs, Colorado

Project Description:

Hall-Irwin was hired to renovate this existing NCAA Football field to convert it from natural to a synthetic turf system. To complete construction, Hall-Irwin's project team excavated the site to remove the existing field and resolve some drainage issues. Then we installed an underdrain system and aggregate field base. We also laser graded the site to prepare for the turf and finally installed the synthetic turf system.