Jesuit Academy

Project Location: Dallas, Texas

Project Description:

Hall-Irwin constructed a baseball field for Jesuit Academy. To complete the project, our scope of work started with testing the soil, surveying the area, completing the earthwork to the specifications of the drawings, and installing an underdrain system. Then we installed the site concrete, put down the aggregate field base and infield mix. We then laser graded the field to get the contours just right, and then installed a warning track and the synthetic turf system.