Integrated Production Services Facility

Project Location: Rock Springs, Wyoming

Project Description:

Integrated Production Services had the need for a new facility in Rock Springs, Wyoming. Hall-Irwin provided design-build services in a negotiated contract to construct a 42,000 square foot pre-engineered metal building to facilitate both an office area as well as a maintenance shop area. The shop area is designed to have a 39 foot eave and included 26 insulated overhead doors.