Reverse Osmosis Plant

Project Location: Milliken, Colorado

Project Description:

We were challenged with building a Reverse Osmosis system with a small footprint that would visually fit into a subdivision. The owner had a small budget and timeframe. The system needed to be low maintenance, require low manpower, and have low noise levels. We used a unique insulated barn design. The completed plant delivers up to 500 gallons of treated water a minute with the capability of producing 720,000 gallons a day.