The Shores Reservoir Pond D Flood Repair

Project Location: Firestone, Colorado

Project Description:

The Shores Reservoir was damaged due to flooding. The repair to the reservoir required rebuilding two slurry wall sections that were breached, each approximately 200 LF. This required us to tie into the existing soil-bentonite cutoff wall (also referred as a slurry wall) at four locations. Additionally, the project included reconstructing the roadway (approximately 1,985 LF), repairing roughly 2,775 LF of the Godding Ditch, dewatering, and removal of 70,000 CY of silt.