Siebring Slurry Wall Repair

Project Location: Greeley, Colorado

Project Description:

This project was to reconstruct various parts of the Seibring Reservoir that were breached by flooding along the Cache LaPoudre River. Hall-Irwin constructed a temporary soil-bentonite cutoff wall (also known as a slurry wall) and reconstructed 165 LF of cutoff wall approximately 20 FT deep.